ISO 9001 Certified

Welded Tee Pipe Anchor Small Bore

C1100

Pipe Sizes3" – 6" IPS

Talk to a pipe support specialist about your application.

1-707-447-5014

General Dimensions & Specifications


Model C1100 Welded Tee Pipe Anchor Small Bore

Models C1100, C1110, C1120, C1130.
C1100 dimensional drawing

Dimensions and ratings are subject to change without notice. Available in all insulation thicknesses.

Note: For welded anchor, see C1000. For insulated friction anchor, see C3000. For large bore welded anchor, see C2100. For insulated positive anchor, see C4000.

Pipe
Size
A Insulation Thickness
1″ 2″ 3″ 4″ 5″ 6″ 7″
B B B B B B B
3 3 4 4 6 6 8 8 10
3.5 3.5 4 4 6 6 8 8 10
4 4 4 4 6 6 8 8 10
5 5 4 4 6 6 8 8 10
6 6 4 4 6 6 8 8 10
All dimensions in inches. “A” and “B” refer to the drawing above.

Application

Models C1100 and C1130 are designed for use on:

  • Pipe sizes through 6″

Model Selection

C1100: Carbon Steel pipe

C1110: Chrome-Moly pipe

C1120: Carbon Silicon pipe

C1130: Stainless pipe

Features

  • Supplied with bolt holes for choice of bolting or welding to support structure
  • Bottom-of-pipe to top-of-steel matches base mounted insulated supports (see “B” Series)
  • Broad selection of materials to match pipe material and eliminate galvanic action

Material Data

C1100 A36 Carbon Steel
C1110 A387 Gr. 22 Chrome-Moly Steel
C1120 A515 Gr. 70 Carbon Silicon Steel
C1130 304L Stainless Steel
Primer Coating Primer coated or hot dipped galvanized. Other coatings available upon request.
Other Materials Available upon request

Need a formal submittal?

Formal submittal sheets are available.

Request a Quote
Custom Design Request

Installation Guide

Installation Model A1000 - A4000 & A9000

Model A1000 – A4000 & A9000

1. Position the bottom half of the insulated hanger shield (insulating structural material, sheet metal jacket and load plate where applicable) on the pipe at the applicable support location as shown.

2. Hold the top half of the shield firmly. Open the overlapping sheet metal jacket and gently slide into position the top half of the insulated shield over the bottom half shield as shown.

Installation Model A5000 - A8400

Model A5000 – A8400

1. When used on a flat surface, position shield so that it is centered on the structural steel.

2. When used with a clevis hanger, position shield symmetrically.

3. When models include heat trace groves, the number and location may vary. Check with design drawings for exact number and location. Ensure that the heat tracing cable is properly positioned inside the grove of the shield.

Completed assembly without load plate

Completed Assembly Without Load Plate

Completed assembly with load plate

Completed Assembly With Load Plate

Downloads & resources

Form
Custom Design Request

Need other I.D.'s, O.D.'s, temperatures or loads? Submit a custom design request.

Start Request →
RFA
Revit RFA 3D Model

A1000 Insulated Pipe Support Revit RFA model for BIM & coordination workflows.

Download 3D Model →
Meet
Schedule a Meeting

Talk through your application with a Pipe Shields engineer.

Book a Time →
Top