

Hardware sold separately. Cross-section & dimension callouts shown in the technical data below.
Insulated Pipe Support · Regular Duty
A1000
A compact, pre-insulated pipe support that carries hot, cold and chilled lines without welding to the pipe – with an overlapping galvanized jacket that minimizes heat loss and condensation across a wide temperature range.
Talk to a pipe support specialist about your application.
1-707-447-5014General Dimensions & Specifications


| Oper. Temp. °F |
Mult. Factor “F” |
|---|---|
| 500 | 0.90 |
| 750 | 0.75 |
| 1000 | 0.50 |
| 1200 | 0.30 |
| TABLE III | |
| Pipe Size |
MAXIMUM LOAD RATING (LBS) |
|
|---|---|---|
| On Flat Surface (a) (c) |
In Clevis Hanger (b) (c) |
|
| 1/2 | 35 | 40 |
| 3/4 | 40 | 45 |
| 1 | 60 | 65 |
| 1 1/4 | 70 | 80 |
| 1 1/2 | 100 | 110 |
| 2 | 125 | 140 |
| 2 1/2 | 150 | 200 |
| 3 | 180 | 250 |
| 3 1/2 | 225 | 300 |
| 4 | 270 | 350 |
| 5 | 350 | 450 |
| 6 | 400 | 550 |
| 8 | 450 | 750 |
| 10 | 500 | 1000 |
| 12 | 550 | 1200 |
| 14 | 575 | 1400 |
| 16 | 600 | 1600 |
| 18 | 625 | 1800 |
| 20 | 675 | 2000 |
| 24 | 750 | 2300 |
| TABLE I | ||
temperatures, and loads.
Available in all insulation thicknesses.
The load ratings represent average values obtained in accordance with accepted
methods and are subject to normal manufacturing variations. Dimensions and ratings
are subject to change without notice.
a) To develop maximum load rating, width of support surface should be at least 1/2 of dimension “A” in Table II.
b) To develop maximum load rating, use band, ring or clevis hanger with manufacturer’s load rating equal to or greater than values shown in Table I.
c) To obtain load ratings for operating temperatures of 500° F and higher, multiply load rating by factor “F” in Table III.
| Iron Pipe Size |
Insulation Thickness | Copper Tubing Size O.D. |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1/2 | 3/4 | 1 | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | |||||||||||
| A | B | A | B | A | B | A | B | A | B | A | B | A | B | A | B | A | B | ||
| 1/2 – 1 1/2 | 4 | 24 | 4 | 24 | 4 | 24 | 4 | 24 | 4 | 24 | 4 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 5/8 – 1 5/8 |
| 2 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 6 | 24 | 2 1/8 |
| 2 1/2 – 4 | 6 | 20 | 6 | 20 | 6 | 20 | 6 | 20 | 6 | 20 | 6 | 20 | 9 | 20 | 9 | 20 | 9 | 20 | 2 5/8 – 4 1/8 |
| 5 | 6 | 20 | 6 | 20 | 6 | 20 | 6 | 20 | 9 | 20 | 9 | 20 | 9 | 20 | 5 1/8 | ||||
| 6 – 7 | 6 | 20 | 6 | 20 | 6 | 20 | 6 | 20 | 9 | 16 | 9 | 16 | 9 | 16 | 6 1/8 | ||||
| 8 – 10 | 9 | 16 | 9 | 16 | 9 | 16 | 9 | 16 | 9 | 16 | 8 1/8 – 10 1/8 | ||||||||
| 12 – 18 | 12 | 16 | 12 | 16 | 12 | 16 | 12 | 16 | 12 | 16 | 12 1/8 | ||||||||
| 20 – 24 | 18 | 16 | 18 | 16 | 18 | 16 | 18 | 16 | 18 | 16 | |||||||||
| TABLE II “B” = gauge of sheet metal jacket | |||||||||||||||||||
Application
Model A1000 is designed for use on:
- Hot water
- Cold water
- Chilled water
- Dual temperature
- Steam
- Air
- Gas
- Vacuum
Intended for installation on:
- Flat surfaces
- Band, ring or clevis pipe hanger
Temperature Range
Standard: +40°F to +1200°F CaSi Insulation
Note: Up to 1800°F available upon request.
Cryogenic: -275°F to +275°F Urethane Insulation.
Add U after the model number (i.e., A1000U)
Features
- Compact
- Eliminates welding to pipe
- Minimizes heat loss and/or condensation
- Other I.D.’s and/or O.D.’s available on request
- Clevis available (see PTP fig. 83)
- Easy installation
- Overlapping galvanized sheet metal jacket
- Copper tubing sizes available
- Clamps available (see G-series)
Material Data
| A1000 Spec Doc | Applicable PSI spec. doc.: No. 205 |
|---|---|
| Standard Insulation | Calcium silicate, asbestos-free, treated with water repellant |
| Jackets | Galvanized steel, ASTM A-653 (overlapping galvanized sheet-metal jacket) |
| Glue | Industrial contact adhesive |
| Cryogenic Insulation | Urethane (for -275°F to +275°F service, model A1000U) |
Need a formal submittal?
Formal submittal sheets are available.
Installation Guide
Model A1000 – A4000 & A9000
1. Position the bottom half of the insulated hanger shield (insulating structural material, sheet metal jacket and load plate where applicable) on the pipe at the applicable support location as shown.
2. Hold the top half of the shield firmly. Open the overlapping sheet metal jacket and gently slide into position the top half of the insulated shield over the bottom half shield as shown.
Model A5000 – A8400
1. When used on a flat surface, position shield so that it is centered on the structural steel.
2. When used with a clevis hanger, position shield symmetrically.
3. When models include heat trace groves, the number and location may vary. Check with design drawings for exact number and location. Ensure that the heat tracing cable is properly positioned inside the grove of the shield.
Completed Assembly Without Load Plate
Completed Assembly With Load Plate
Downloads & resources
Custom Design Request
Need other I.D.'s, O.D.'s, temperatures or loads? Submit a custom design request.
Start Request →Revit RFA 3D Model
A1000 Insulated Pipe Support Revit RFA model for BIM & coordination workflows.
Download 3D Model →