Transition Piece for Olefin Site at Chocolate Bayou

September 1, 2022

Transition Piece for Olefin Site at Chocolate Bayou
Transition Piece for Olefin Site at Chocolate Bayou

Transition Piece for Olefin Site at Chocolate Bayou
Transition Piece in Progress

Sweco Fab, Inc. recently designed and manufactured a 1,900 lb. transition piece for an olefin site at Chocolate Bayou on the Texas Gulf Coast. The product transitions from round to oval and is made of 36″ half pipe construction. The piece measures 36″ x 72″ x 60″ and is constructed of carbon steel. The transition piece will be used to regulate the flow of both air and liquid. Prior to shipping the product was hydrotested to guarantee quality.

Do you require a transition piece in your piping system? Get pricing now!
request-a-quote


Top